Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
56.3 min
Lead Time (LT)
7.85 d
Value-Added
3.5 h
Efficiency (PCE)
6.02%
BottleneckHydraulic Shear-Bolt Weld
4 < 8/day
Limit: changeovers
Quality (RTY)
85.9%
WIP Capital
€365,800
Carbon CO₂
6.5 t CO₂e/year