Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Acute Thermal Burn Wound Stabilization Pathway
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.39 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
8.82%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Hydrotherapy Wound Debride
7 < 10/day
Limit: downtime
Hydrotherapy Wound Debride: capacity 7/day vs demand 10/day. Main limit: downtime. Raw C/T 2.4 h, effective C/T 3.1 h.
Quality (RTY)
80.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€116,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silver Dressings & Gr…
Sterile Tank & Fluid Re…
24/7 STAT · LT 1d
PRODUCTION CONTROL / ERP
Burn Unit EHR
Acuity Queue & Radiology Hold
CUSTOMER
Regional Burn ICU
10 patients/d
Takt: 2.3 h
EDI / 24/7 Continuous
MRP / 24/7 STAT
★ PACEMAKER
IN
Insert a step at the start
+
I
4
0.40 d
Drag to reorder step 1
ED FRONT
1. Airway Check & P…
×3
FIFO Lane
C/T
1.3 h
C/O
2 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
1 / 1d
OEE
95.4%
i
FIFO
Insert a step here
+
I
6
0.60 d
Drag to reorder step 2
FAST TRACK
2. Heated Room Anal…
×4
Push Flow
C/T
1.8 h
C/O
4 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
1 / 1d
OEE
89.8%
i
Insert a step here
+
I
12
1.20 d
FLOW
Nurse POC…
Drag to reorder step 3
DIAGNOSTICS
3. Hydrotherapy Wou…
×3
BOTTLENECK
C/T
2.4 h
C/O
12 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
2 / 1d
OEE
74.7%
i
Insert a step here
+
I
8
0.80 d
Drag to reorder step 4
RESUS BAY
4. Silver Biologica…
×5
Push Flow
C/T
1.9 h
C/O
6 min
Availability
92%
Quality FPY
96.5%
Batch / EPEI
1 / 1d
OEE
88.4%
i
Insert a step here
+
I
7
0.70 d
Drag to reorder step 5
BED FLOW
5. Temp-Controlled …
×2
FIFO Lane
C/T
1.4 h
C/O
5 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
1 / 1d
OEE
91.0%
i
Insert a step at the end
+
I
3
0.30 d
Finished Goods
OUT
0.40 d
VA 1.3 h
0.60 d
VA 1.8 h
1.20 d
VA 2.4 h
0.80 d
VA 1.9 h
0.70 d
VA 1.4 h
0.30 d
Total Lead Time
4.39 d
VA Time
8.7 h
PCE
8.82%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step