Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Volume Ophthalmic Cataract Day Clinic
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
8.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
2.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
34.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Dual-OR Phaco Surgery
32 < 64/day
Limit: changeovers
Dual-OR Phaco Surgery: capacity 32/day vs demand 64/day. Main limit: changeovers. Raw C/T 9.5 min, effective C/T 12.1 min.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€52,780
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
37.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Ophthalmic IOL & Visc…
Foldable Toric IOL Packs
2x / day · LT 1d
PRODUCTION CONTROL / ERP
Ophthalmic EHR
Fixed Time-Slot Block Schedule
CUSTOMER
Senior Ophthalmology …
64 patients/d
Takt: 8.9 min
EDI / Continuous
MRP / 2x / day
★ PACEMAKER
IN
Insert a step at the start
+
I
38
0.59 d
Drag to reorder step 1
RECEPTION
1. Visual Acuity & …
×2
Push Flow
C/T
5.7 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
13 / 1d
OEE
89.6%
i
Insert a step here
+
I
32
0.50 d
Drag to reorder step 2
PRE-OP BAY
2. Dilating Drops P…
×3
Push Flow
C/T
7.5 min
C/O
10 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
13 / 1d
OEE
82.3%
i
Insert a step here
+
I
51
0.80 d
SMED
SMED Para…
Drag to reorder step 3
OR SUITE
3. Dual-OR Phaco Su…
×4
BOTTLENECK
C/T
9.5 min
C/O
28 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
10 / 1d
OEE
54.1%
i
Insert a step here
+
I
26
0.41 d
Drag to reorder step 4
RECOVERY
4. 15-Min Tea & Obs…
×3
FIFO Lane
C/T
7.0 min
C/O
6 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
6 / 1d
OEE
82.8%
i
FIFO
Insert a step here
+
I
19
0.30 d
Drag to reorder step 5
DISCHARGE
5. Post-Op Drops & …
×1
Continuous Flow
C/T
4.3 min
C/O
4 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
6 / 1d
OEE
88.4%
i
Insert a step at the end
+
I
16
0.25 d
Finished Goods
OUT
0.59 d
VA 5.7 min
0.50 d
VA 7.5 min
0.80 d
VA 9.5 min
0.41 d
VA 7.0 min
0.30 d
VA 4.3 min
0.25 d
Total Lead Time
2.90 d
VA Time
34.0 min
PCE
2.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step