Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Interventional Cardiology Elective PCI Stent Lab
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
2.96 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.60%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Coronary Stent Deployment
14 < 28/day
Limit: changeovers
Coronary Stent Deployment: capacity 14/day vs demand 28/day. Main limit: changeovers. Raw C/T 21.8 min, effective C/T 27.6 min.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€146,150
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Stent Consignment
Catheters & Radial Bands
2x / day · LT 1d
PRODUCTION CONTROL / ERP
CathLab PACS
Fixed Time-Slot Block Schedule
CUSTOMER
Cardiac Short-Stay
28 patients/d
Takt: 20.4 min
EDI / Continuous
MRP / 2x / day
★ PACEMAKER
IN
Insert a step at the start
+
I
17
0.61 d
Drag to reorder step 1
RECEPTION
1. Radial Check & C…
×2
Push Flow
C/T
13.0 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
6 / 1d
OEE
89.8%
i
Insert a step here
+
I
14
0.50 d
Drag to reorder step 2
PRE-OP BAY
2. Fluoroscopy Tabl…
×3
Push Flow
C/T
17.1 min
C/O
10 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
6 / 1d
OEE
82.7%
i
Insert a step here
+
I
22
0.79 d
SMED
SMED Para…
Drag to reorder step 3
OR SUITE
3. Coronary Stent D…
×4
BOTTLENECK
C/T
21.8 min
C/O
28 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
4 / 1d
OEE
51.8%
i
Insert a step here
+
I
11
0.39 d
Drag to reorder step 4
RECOVERY
4. Radial Compressi…
×3
FIFO Lane
C/T
15.9 min
C/O
6 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
3 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
8
0.29 d
Drag to reorder step 5
DISCHARGE
5. Same-Evening Saf…
×1
Continuous Flow
C/T
9.8 min
C/O
4 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
3 / 1d
OEE
89.3%
i
Insert a step at the end
+
I
7
0.25 d
Finished Goods
OUT
0.61 d
VA 13.0 min
0.50 d
VA 17.1 min
0.79 d
VA 21.8 min
0.39 d
VA 15.9 min
0.29 d
VA 9.8 min
0.25 d
Total Lead Time
2.96 d
VA Time
1.3 h
PCE
4.60%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step