Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Paramedic Ambulance ED Offload <15-Min Loop
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.77 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.58%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Quick Verbal MIST & Bed Flip
45 < 65/day
Limit: downtime
Quick Verbal MIST & Bed Flip: capacity 45/day vs demand 65/day. Main limit: downtime. Raw C/T 22.2 min, effective C/T 28.4 min.
Quality (RTY)
80.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€45,790
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
36.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Municipal EMS Fleet
Stretcher & Electronic …
24/7 STAT · LT 1d
PRODUCTION CONTROL / ERP
CAD EMS-Hospital
Acuity Queue & Radiology Hold
CUSTOMER
ED Triage Transfer Do…
65 patients/d
Takt: 20.8 min
EDI / 24/7 Continuous
MRP / 24/7 STAT
★ PACEMAKER
IN
Insert a step at the start
+
I
23
0.35 d
Drag to reorder step 1
ED FRONT
1. Pre-Arrival ETA …
×3
FIFO Lane
C/T
11.6 min
C/O
2 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
7 / 1d
OEE
94.2%
i
FIFO
Insert a step here
+
I
36
0.55 d
Drag to reorder step 2
FAST TRACK
2. Dedicated EMS Tr…
×4
Push Flow
C/T
16.2 min
C/O
4 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
7 / 1d
OEE
87.6%
i
Insert a step here
+
I
75
1.15 d
FLOW
Nurse POC…
Drag to reorder step 3
DIAGNOSTICS
3. Quick Verbal MIS…
×3
BOTTLENECK
C/T
22.2 min
C/O
12 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
13 / 1d
OEE
74.7%
i
Insert a step here
+
I
49
0.75 d
Drag to reorder step 4
RESUS BAY
4. Bio-Clean Ambula…
×5
Push Flow
C/T
17.5 min
C/O
6 min
Availability
92%
Quality FPY
96.5%
Batch / EPEI
7 / 1d
OEE
85.1%
i
Insert a step here
+
I
42
0.65 d
Drag to reorder step 5
BED FLOW
5. Unit Back-In-Ser…
×2
FIFO Lane
C/T
12.9 min
C/O
5 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
7 / 1d
OEE
88.2%
i
Insert a step at the end
+
I
16
0.25 d
Finished Goods
OUT
0.35 d
VA 11.6 min
0.55 d
VA 16.2 min
1.15 d
VA 22.2 min
0.75 d
VA 17.5 min
0.65 d
VA 12.9 min
0.25 d
Total Lead Time
3.77 d
VA Time
1.3 h
PCE
1.58%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step