Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Post-Surgical ICU-to-General-Ward Transfer Flow
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.4 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.04 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
6.27%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Bed Clean & Telemetry Prep
13 < 20/day
Limit: downtime
Bed Clean & Telemetry Prep: capacity 13/day vs demand 20/day. Main limit: downtime. Raw C/T 1.5 h, effective C/T 1.9 h.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€111,150
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Transport & Telemetry…
Portable Monitors & O2 …
2x / day · LT 1d
PRODUCTION CONTROL / ERP
Bed Management EHR
Fixed Time-Slot Block Schedule
CUSTOMER
Medical-Surgical Wards
20 patients/d
Takt: 1.4 h
EDI / Continuous
MRP / 2x / day
★ PACEMAKER
IN
Insert a step at the start
+
I
12
0.60 d
Drag to reorder step 1
RECEPTION
1. Intensivist Step…
×2
Push Flow
C/T
54.7 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
4 / 1d
OEE
92.2%
i
Insert a step here
+
I
10
0.50 d
Drag to reorder step 2
PRE-OP BAY
2. Receiving Ward N…
×3
Push Flow
C/T
1.2 h
C/O
10 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
4 / 1d
OEE
87.4%
i
Insert a step here
+
I
16
0.80 d
SMED
SMED Para…
Drag to reorder step 3
OR SUITE
3. Bed Clean & Tele…
×4
BOTTLENECK
C/T
1.5 h
C/O
28 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
3 / 1d
OEE
70.3%
i
Insert a step here
+
I
8
0.40 d
Drag to reorder step 4
RECOVERY
4. Safe ICU Porter …
×3
FIFO Lane
C/T
1.1 h
C/O
6 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
2 / 1d
OEE
90.0%
i
FIFO
Insert a step here
+
I
6
0.30 d
Drag to reorder step 5
DISCHARGE
5. Ward Med Reconci…
×1
Continuous Flow
C/T
41.0 min
C/O
4 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
2 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
5
0.25 d
Finished Goods
OUT
0.60 d
VA 54.7 min
0.50 d
VA 1.2 h
0.80 d
VA 1.5 h
0.40 d
VA 1.1 h
0.30 d
VA 41.0 min
0.25 d
Total Lead Time
3.04 d
VA Time
5.4 h
PCE
6.27%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step