Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Enhanced-Recovery (ERAS) Total Knee Arthroplasty
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
31.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.04 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
6.95%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Day-0 PT Mobilization
9 < 18/day
Limit: changeovers
Day-0 PT Mobilization: capacity 9/day vs demand 18/day. Main limit: changeovers. Raw C/T 33.9 min, effective C/T 42.9 min.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€173,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Robot-Guided Knee Imp…
Loaner Ortho Tray Sets
2x / day · LT 1d
PRODUCTION CONTROL / ERP
OR Scheduling EHR
Fixed Time-Slot Block Schedule
CUSTOMER
Inpatient Ortho Ward
18 patients/d
Takt: 31.7 min
EDI / Continuous
MRP / 2x / day
★ PACEMAKER
IN
Insert a step at the start
+
I
11
0.61 d
Drag to reorder step 1
RECEPTION
1. Pre-Habilitation…
×2
Push Flow
C/T
20.3 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
4 / 1d
OEE
89.9%
i
Insert a step here
+
I
9
0.50 d
Drag to reorder step 2
PRE-OP BAY
2. Robot-Guided Kne…
×3
Push Flow
C/T
26.6 min
C/O
10 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
4 / 1d
OEE
82.9%
i
Insert a step here
+
I
14
0.78 d
SMED
SMED Para…
Drag to reorder step 3
OR SUITE
3. Day-0 PT Mobiliz…
×4
BOTTLENECK
C/T
33.9 min
C/O
28 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
3 / 1d
OEE
55.7%
i
Insert a step here
+
I
7
0.39 d
Drag to reorder step 4
RECOVERY
4. Acute Pain Oral …
×3
FIFO Lane
C/T
24.7 min
C/O
6 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
2 / 1d
OEE
84.5%
i
FIFO
Insert a step here
+
I
5
0.28 d
Drag to reorder step 5
DISCHARGE
5. Home Physio Disc…
×1
Continuous Flow
C/T
15.2 min
C/O
4 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
2 / 1d
OEE
89.5%
i
Insert a step at the end
+
I
5
0.28 d
Finished Goods
OUT
0.61 d
VA 20.3 min
0.50 d
VA 26.6 min
0.78 d
VA 33.9 min
0.39 d
VA 24.7 min
0.28 d
VA 15.2 min
0.28 d
Total Lead Time
3.04 d
VA Time
2.0 h
PCE
6.95%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step