Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Child-Friendly Pediatric Urgent Fast-Track
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
8.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.75 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
31.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.94%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Fast-Track NP/Pediatrician
75 < 110/day
Limit: downtime
Fast-Track NP/Pediatrician: capacity 75/day vs demand 110/day. Main limit: downtime. Raw C/T 8.8 min, effective C/T 11.2 min.
Quality (RTY)
80.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€67,485
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
61.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pediatric Weight Dose…
POCT Strep/RSV & Nebuli…
24/7 STAT · LT 1d
PRODUCTION CONTROL / ERP
Pediatric ED EHR
Acuity Queue & Radiology Hold
CUSTOMER
Pediatric Families
110 patients/d
Takt: 8.2 min
EDI / 24/7 Continuous
MRP / 24/7 STAT
★ PACEMAKER
IN
Insert a step at the start
+
I
39
0.35 d
Drag to reorder step 1
ED FRONT
1. Weight-Based Tri…
×3
FIFO Lane
C/T
4.6 min
C/O
2 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
11 / 1d
OEE
93.4%
i
FIFO
Insert a step here
+
I
61
0.55 d
Drag to reorder step 2
FAST TRACK
2. Comfort Numbing …
×4
Push Flow
C/T
6.4 min
C/O
4 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
11 / 1d
OEE
86.0%
i
Insert a step here
+
I
126
1.15 d
FLOW
Nurse POC…
Drag to reorder step 3
DIAGNOSTICS
3. Fast-Track NP/Pe…
×3
BOTTLENECK
C/T
8.8 min
C/O
12 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
22 / 1d
OEE
73.0%
i
Insert a step here
+
I
83
0.75 d
Drag to reorder step 4
RESUS BAY
4. Nebulizer & Swab…
×5
Push Flow
C/T
6.9 min
C/O
6 min
Availability
92%
Quality FPY
96.5%
Batch / EPEI
11 / 1d
OEE
82.9%
i
Insert a step here
+
I
72
0.65 d
Drag to reorder step 5
BED FLOW
5. Parent Fever Gui…
×2
FIFO Lane
C/T
5.1 min
C/O
5 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
11 / 1d
OEE
86.3%
i
Insert a step at the end
+
I
28
0.25 d
Finished Goods
OUT
0.35 d
VA 4.6 min
0.55 d
VA 6.4 min
1.15 d
VA 8.8 min
0.75 d
VA 6.9 min
0.65 d
VA 5.1 min
0.25 d
Total Lead Time
3.75 d
VA Time
31.7 min
PCE
0.94%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step