Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
42.2 min
Lead Time (LT)
3.84 d
Value-Added
2.7 h
Efficiency (PCE)
3.15%
BottleneckPsychiatrist Tele/Consult Eval
22 < 32/day
Limit: downtime
Quality (RTY)
80.6%
WIP Capital
€45,220
Carbon CO₂
18.0 t CO₂e/year