Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Code STEMI Heart-Attack Door-to-Balloon <60m
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.48 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
14.40%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Radial Puncture & Angioplasty
4 < 6/day
Limit: downtime
Radial Puncture & Angioplasty: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 4.0 h, effective C/T 5.1 h.
Quality (RTY)
80.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€55,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
EMS Telemetry ECG Feed
On-Call Cath Team & Ste…
24/7 STAT · LT 1d
PRODUCTION CONTROL / ERP
STEMI Alert Pager
Acuity Queue & Radiology Hold
CUSTOMER
CCU Intensive Cardiac…
6 patients/d
Takt: 3.8 h
EDI / 24/7 Continuous
MRP / 24/7 STAT
★ PACEMAKER
IN
Insert a step at the start
+
I
2
0.33 d
Drag to reorder step 1
ED FRONT
1. EMS Pre-Hospital…
×3
FIFO Lane
C/T
2.1 h
C/O
2 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
1 / 1d
OEE
95.4%
i
FIFO
Insert a step here
+
I
3
0.50 d
Drag to reorder step 2
FAST TRACK
2. ED Bypass Direct…
×4
Push Flow
C/T
2.9 h
C/O
4 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
1 / 1d
OEE
89.8%
i
Insert a step here
+
I
7
1.17 d
FLOW
Nurse POC…
Drag to reorder step 3
DIAGNOSTICS
3. Radial Puncture …
×3
BOTTLENECK
C/T
4.0 h
C/O
12 min
Availability
85%
Quality FPY
92.0%
Batch / EPEI
1 / 1d
OEE
77.5%
i
Insert a step here
+
I
5
0.83 d
Drag to reorder step 4
RESUS BAY
4. Thrombus & Ballo…
×5
Push Flow
C/T
3.2 h
C/O
6 min
Availability
92%
Quality FPY
96.5%
Batch / EPEI
1 / 1d
OEE
88.4%
i
Insert a step here
+
I
4
0.67 d
Drag to reorder step 5
BED FLOW
5. Coronary ICU Tra…
×2
FIFO Lane
C/T
2.3 h
C/O
5 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
1 / 1d
OEE
91.0%
i
Insert a step at the end
+
I
2
0.33 d
Finished Goods
OUT
0.33 d
VA 2.1 h
0.50 d
VA 2.9 h
1.17 d
VA 4.0 h
0.83 d
VA 3.2 h
0.67 d
VA 2.3 h
0.33 d
Total Lead Time
4.48 d
VA Time
14.5 h
PCE
14.40%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step