Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Outpatient Surgery Clinical Pathway
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
2.95 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
48.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.87%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Operating Theater
23 < 45/day
Limit: changeovers
Operating Theater: capacity 23/day vs demand 45/day. Main limit: changeovers. Raw C/T 13.6 min, effective C/T 17.2 min.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€54,180
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
26.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Central Sterile Pharm…
Sterile Surgical Kits
2x / day · LT 1d
PRODUCTION CONTROL / ERP
HIS / OR Board
Fixed Time-Slot Block Schedule
CUSTOMER
Outpatient Patients
45 patients/d
Takt: 12.7 min
EDI / Continuous
MRP / 2x / day
★ PACEMAKER
IN
Insert a step at the start
+
I
27
0.60 d
Drag to reorder step 1
RECEPTION
1. Patient Intake
×2
Push Flow
C/T
8.1 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
9 / 1d
OEE
89.5%
i
Insert a step here
+
I
23
0.51 d
Drag to reorder step 2
PRE-OP BAY
2. Nursing Pre-Op P…
×3
Push Flow
C/T
10.6 min
C/O
10 min
Availability
94%
Quality FPY
95.8%
Batch / EPEI
9 / 1d
OEE
82.2%
i
Insert a step here
+
I
36
0.80 d
SMED
SMED Para…
Drag to reorder step 3
OR SUITE
3. Operating Theater
×4
BOTTLENECK
C/T
13.6 min
C/O
28 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
7 / 1d
OEE
54.0%
i
Insert a step here
+
I
18
0.40 d
Drag to reorder step 4
RECOVERY
4. PACU Recovery
×3
FIFO Lane
C/T
9.9 min
C/O
6 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
5 / 1d
OEE
84.5%
i
FIFO
Insert a step here
+
I
14
0.31 d
Drag to reorder step 5
DISCHARGE
5. Medical Discharge
×1
Continuous Flow
C/T
6.1 min
C/O
4 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
5 / 1d
OEE
89.5%
i
Insert a step at the end
+
I
11
0.24 d
Finished Goods
OUT
0.60 d
VA 8.1 min
0.51 d
VA 10.6 min
0.80 d
VA 13.6 min
0.40 d
VA 9.9 min
0.31 d
VA 6.1 min
0.24 d
Total Lead Time
2.95 d
VA Time
48.3 min
PCE
2.87%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step