Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
5,000-Guest Mega Cruise Ship Port Turnaround
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
45 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
2200 Stateroom Bio-Sanitize
1,455 < 2,200/day
Limit: changeovers
2200 Stateroom Bio-Sanitize: capacity 1,455/day vs demand 2,200/day. Main limit: changeovers. Raw C/T 13 s, effective C/T 16 s.
Quality (RTY)
84.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€346,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
807.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Port Bonded Reefer Co…
Fresh Food, Luggage & L…
Daily AM Linen · LT 1d
PRODUCTION CONTROL / ERP
Cruise Ops PMS
Batch Floor Sweep After 11:00
CUSTOMER
Embarking Cruise Gues…
2,200 rooms/d
Takt: 12 s
EDI / 15:00 Check-In Wave
MRP / Daily AM Linen
★ PACEMAKER
IN
Insert a step at the start
+
I
1,100
0.50 d
Drag to reorder step 1
FRONT RUNNER
1. Debarkation & Lu…
×2
FIFO Lane
C/T
7.9 s
C/O
3 min
Availability
97%
Quality FPY
98.5%
Batch / EPEI
440 / 1d
OEE
92.4%
i
FIFO
Insert a step here
+
I
1,540
0.70 d
Drag to reorder step 2
FLOOR RUNNER
2. Crane-Load 200 F…
×2
Push Flow
C/T
9.3 s
C/O
5 min
Availability
95%
Quality FPY
98.1%
Batch / EPEI
440 / 1d
OEE
88.0%
i
Insert a step here
+
I
2,640
1.20 d
BALANCING
Zone Pair…
Drag to reorder step 3
HOUSEKEEPING
3. 2200 Stateroom B…
×12
BOTTLENECK
C/T
13 s
C/O
8 min
Availability
88%
Quality FPY
91.0%
Batch / EPEI
330 / 1d
OEE
70.6%
i
Insert a step here
+
I
990
0.45 d
Drag to reorder step 4
SUPERVISION
4. Muster Drill & C…
×2
FIFO Lane
C/T
8.3 s
C/O
2 min
Availability
96%
Quality FPY
96.5%
Batch / EPEI
220 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
550
0.25 d
Drag to reorder step 5
FRONT DESK
5. 4PM All-Aboard S…
×3
Continuous Flow
C/T
6.4 s
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
220 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
880
0.40 d
Finished Goods
OUT
0.50 d
VA 7.9 s
0.70 d
VA 9.3 s
1.20 d
VA 13 s
0.45 d
VA 8.3 s
0.25 d
VA 6.4 s
0.40 d
Total Lead Time
3.50 d
VA Time
45 s
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen