Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Executive Private Aviation FBO Quick Turn
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.67 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.57%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Jet-A1 Fuel, Lav & GPU Service
20 < 28/day
Limit: downtime
Jet-A1 Fuel, Lav & GPU Service: capacity 20/day vs demand 28/day. Main limit: downtime. Raw C/T 34.4 min, effective C/T 43.0 min.
Quality (RTY)
84.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€47,520
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Jet-A1 Truck & VIP Ca…
Gourmet Platters & GPU …
Daily AM Linen · LT 1d
PRODUCTION CONTROL / ERP
FBO ERP
Batch Floor Sweep After 11:00
CUSTOMER
Private Jet Passengers
28 cases/d
Takt: 32.1 min
EDI / 15:00 Check-In Wave
MRP / Daily AM Linen
★ PACEMAKER
IN
Insert a step at the start
+
I
14
0.50 d
Drag to reorder step 1
FRONT RUNNER
1. Flight Plan Slot…
×2
FIFO Lane
C/T
20.6 min
C/O
3 min
Availability
97%
Quality FPY
98.5%
Batch / EPEI
6 / 1d
OEE
94.1%
i
FIFO
Insert a step here
+
I
20
0.71 d
Drag to reorder step 2
FLOOR RUNNER
2. VIP Customs & Ba…
×2
Push Flow
C/T
24.4 min
C/O
5 min
Availability
95%
Quality FPY
98.1%
Batch / EPEI
6 / 1d
OEE
90.8%
i
Insert a step here
+
I
34
1.21 d
BALANCING
Zone Pair…
Drag to reorder step 3
HOUSEKEEPING
3. Jet-A1 Fuel, Lav…
×12
BOTTLENECK
C/T
34.4 min
C/O
8 min
Availability
88%
Quality FPY
91.0%
Batch / EPEI
4 / 1d
OEE
75.1%
i
Insert a step here
+
I
13
0.46 d
Drag to reorder step 4
SUPERVISION
4. Cabin Vacuum & I…
×2
FIFO Lane
C/T
21.9 min
C/O
2 min
Availability
96%
Quality FPY
96.5%
Batch / EPEI
3 / 1d
OEE
90.7%
i
FIFO
Insert a step here
+
I
7
0.25 d
Drag to reorder step 5
FRONT DESK
5. Clearance Tug Pu…
×3
Continuous Flow
C/T
16.7 min
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
3 / 1d
OEE
96.2%
i
Insert a step at the end
+
I
11
0.39 d
Finished Goods
OUT
0.50 d
VA 20.6 min
0.71 d
VA 24.4 min
1.21 d
VA 34.4 min
0.46 d
VA 21.9 min
0.25 d
VA 16.7 min
0.39 d
Total Lead Time
3.67 d
VA Time
2.0 h
PCE
3.57%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step