Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
University Campus Summer Room Turnaround
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
113 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.52 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.44%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Deep Carpet Steam & Mattress
159 < 240/day
Limit: changeovers
Deep Carpet Steam & Mattress: capacity 159/day vs demand 240/day. Main limit: changeovers. Raw C/T 2.0 min, effective C/T 2.5 min.
Quality (RTY)
84.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€28,560
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
88.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Campus Facilities & P…
Mattresses, Keycards & …
Daily AM Linen · LT 1d
PRODUCTION CONTROL / ERP
Campus Facilities ERP
Batch Floor Sweep After 11:00
CUSTOMER
Incoming Autumn Fresh…
240 rooms/d
Takt: 113 s
EDI / 15:00 Check-In Wave
MRP / Daily AM Linen
★ PACEMAKER
IN
Insert a step at the start
+
I
120
0.50 d
Drag to reorder step 1
FRONT RUNNER
1. Move-Out Invento…
×2
FIFO Lane
C/T
72 s
C/O
3 min
Availability
97%
Quality FPY
98.5%
Batch / EPEI
48 / 1d
OEE
92.4%
i
FIFO
Insert a step here
+
I
168
0.70 d
Drag to reorder step 2
FLOOR RUNNER
2. Maintenance Pain…
×2
Push Flow
C/T
86 s
C/O
5 min
Availability
95%
Quality FPY
98.1%
Batch / EPEI
48 / 1d
OEE
88.0%
i
Insert a step here
+
I
288
1.20 d
BALANCING
Zone Pair…
Drag to reorder step 3
HOUSEKEEPING
3. Deep Carpet Stea…
×12
BOTTLENECK
C/T
2.0 min
C/O
8 min
Availability
88%
Quality FPY
91.0%
Batch / EPEI
36 / 1d
OEE
70.6%
i
Insert a step here
+
I
108
0.45 d
Drag to reorder step 4
SUPERVISION
4. Inspector Checkl…
×2
FIFO Lane
C/T
77 s
C/O
2 min
Availability
96%
Quality FPY
96.5%
Batch / EPEI
24 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
60
0.25 d
Drag to reorder step 5
FRONT DESK
5. Key-Packet Move-…
×3
Continuous Flow
C/T
59 s
C/O
2 min
Availability
99%
Quality FPY
99.2%
Batch / EPEI
24 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
96
0.40 d
Finished Goods
OUT
0.50 d
VA 72 s
0.70 d
VA 86 s
1.20 d
VA 2.0 min
0.45 d
VA 77 s
0.25 d
VA 59 s
0.40 d
Total Lead Time
3.52 d
VA Time
6.9 min
PCE
0.44%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step