Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Annual Role Grading & Market Salary Survey Flow
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.36 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.68%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pay-Equity & Gender Gap Check
33 < 65/day
Limit: changeovers
Pay-Equity & Gender Gap Check: capacity 33/day vs demand 65/day. Main limit: changeovers. Raw C/T 7.4 min, effective C/T 9.8 min.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€89,100
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Survey Pay Data
Internal Role Descripti…
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
Pay Benchmark / HR Cloud
Sequential Silo Hand-offs
CUSTOMER
People Partners & Fin…
65 files/d
Takt: 6.9 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
104
1.60 d
Drag to reorder step 1
TALENT SOURCING
1. Job Family Level…
×2
Push Flow
C/T
4.4 min
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
16 / 1d
OEE
80.3%
i
Insert a step here
+
I
130
2.00 d
Drag to reorder step 2
HIRING PANEL
2. Market Percentil…
×3
Push Flow
C/T
5.5 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
16 / 1d
OEE
76.0%
i
Insert a step here
+
I
182
2.80 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Pay-Equity & Gen…
×2
BOTTLENECK
C/T
7.4 min
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
13 / 1d
OEE
54.7%
i
Insert a step here
+
I
52
0.80 d
Drag to reorder step 4
PEOPLE OPS
4. CFO Range Band A…
×2
FIFO Lane
C/T
4.7 min
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
7 / 1d
OEE
84.9%
i
FIFO
Insert a step here
+
I
33
0.51 d
Drag to reorder step 5
WORKPLACE
5. HRIS Pay Range U…
×2
Continuous Flow
C/T
3.5 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
92.0%
i
Insert a step at the end
+
I
39
0.60 d
Finished Goods
OUT
1.60 d
VA 4.4 min
2.00 d
VA 5.5 min
2.80 d
VA 7.4 min
0.80 d
VA 4.7 min
0.51 d
VA 3.5 min
0.60 d
Total Lead Time
8.36 d
VA Time
25.5 min
PCE
0.68%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step