Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Contingent Tech Contractor VMS Sourcing Flow
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
11.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.39 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
43.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
IR35 / Tax Status Compliance
20 < 38/day
Limit: changeovers
IR35 / Tax Status Compliance: capacity 20/day vs demand 38/day. Main limit: changeovers. Raw C/T 12.7 min, effective C/T 16.7 min.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€45,675
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Staffing Agencies Pool
SOW Rates & Security NDA
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
VMS Platform
Sequential Silo Hand-offs
CUSTOMER
Engineering Team Leads
38 files/d
Takt: 11.8 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
61
1.61 d
Drag to reorder step 1
TALENT SOURCING
1. Rate-Card Requis…
×2
Push Flow
C/T
7.6 min
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
10 / 1d
OEE
80.9%
i
Insert a step here
+
I
76
2.00 d
Drag to reorder step 2
HIRING PANEL
2. Agency Shortlist…
×3
Push Flow
C/T
9.5 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
10 / 1d
OEE
76.8%
i
Insert a step here
+
I
106
2.79 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. IR35 / Tax Statu…
×2
BOTTLENECK
C/T
12.7 min
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
8 / 1d
OEE
55.7%
i
Insert a step here
+
I
30
0.79 d
Drag to reorder step 4
PEOPLE OPS
4. VMS PO & Badge P…
×2
FIFO Lane
C/T
8.1 min
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
84.7%
i
FIFO
Insert a step here
+
I
19
0.50 d
Drag to reorder step 5
WORKPLACE
5. Day-1 Repo Acces…
×2
Continuous Flow
C/T
5.9 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
23
0.61 d
Finished Goods
OUT
1.61 d
VA 7.6 min
2.00 d
VA 9.5 min
2.79 d
VA 12.7 min
0.79 d
VA 8.1 min
0.50 d
VA 5.9 min
0.61 d
Total Lead Time
8.39 d
VA Time
43.7 min
PCE
1.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step