Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
International Executive Visa & Travel Desk Flow
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.33 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
15.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.40%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Visa / High-Risk Country Clear
56 < 110/day
Limit: changeovers
Visa / High-Risk Country Clear: capacity 56/day vs demand 110/day. Main limit: changeovers. Raw C/T 4.4 min, effective C/T 5.8 min.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€34,694
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
12.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Travel Manager / GDS …
Flight, Hotel & Risk Ad…
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
Travel Booking Platform
Sequential Silo Hand-offs
CUSTOMER
Field Engineers & Exe…
110 files/d
Takt: 4.1 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
176
1.60 d
Drag to reorder step 1
TALENT SOURCING
1. Policy-Compliant…
×2
Push Flow
C/T
2.6 min
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
28 / 1d
OEE
80.6%
i
Insert a step here
+
I
220
2.00 d
Drag to reorder step 2
HIRING PANEL
2. Out-of-Policy Co…
×3
Push Flow
C/T
3.3 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
28 / 1d
OEE
76.4%
i
Insert a step here
+
I
308
2.80 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Visa / High-Risk…
×2
BOTTLENECK
C/T
4.4 min
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
22 / 1d
OEE
54.7%
i
Insert a step here
+
I
88
0.80 d
Drag to reorder step 4
PEOPLE OPS
4. GDS Ticketing & …
×2
FIFO Lane
C/T
2.8 min
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
11 / 1d
OEE
84.2%
i
FIFO
Insert a step here
+
I
55
0.50 d
Drag to reorder step 5
WORKPLACE
5. Auto Expense Fee…
×2
Continuous Flow
C/T
2.1 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
11 / 1d
OEE
91.6%
i
Insert a step at the end
+
I
66
0.60 d
Finished Goods
OUT
1.60 d
VA 2.6 min
2.00 d
VA 3.3 min
2.80 d
VA 4.4 min
0.80 d
VA 2.8 min
0.50 d
VA 2.1 min
0.60 d
Total Lead Time
8.33 d
VA Time
15.1 min
PCE
0.40%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step