Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
C-Suite & VP Executive Retained Search Cycle
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.92 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
10.34%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Behavioral & Reference Probe
3 < 4/day
Limit: downtime
Behavioral & Reference Probe: capacity 3/day vs demand 4/day. Main limit: downtime. Raw C/T 2.0 h, effective C/T 2.7 h.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€144,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Executive Talent Netw…
Confidential Role Briefs
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
Recruiting CRM
Sequential Silo Hand-offs
CUSTOMER
Board Nomination Comm…
4 files/d
Takt: 1.9 h
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
6
1.50 d
Drag to reorder step 1
TALENT SOURCING
1. Market Mapping &…
×2
Push Flow
C/T
1.2 h
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
1 / 1d
OEE
86.4%
i
Insert a step here
+
I
8
2.00 d
Drag to reorder step 2
HIRING PANEL
2. Confidential Out…
×3
Push Flow
C/T
1.5 h
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
1 / 1d
OEE
85.0%
i
Insert a step here
+
I
11
2.75 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Behavioral & Ref…
×2
BOTTLENECK
C/T
2.0 h
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
1 / 1d
OEE
71.5%
i
Insert a step here
+
I
3
0.75 d
Drag to reorder step 4
PEOPLE OPS
4. Board Finalist P…
×2
FIFO Lane
C/T
1.3 h
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
93.6%
i
FIFO
Insert a step here
+
I
2
0.50 d
Drag to reorder step 5
WORKPLACE
5. Equity Package N…
×2
Continuous Flow
C/T
56.3 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
97.5%
i
Insert a step at the end
+
I
2
0.50 d
Finished Goods
OUT
1.50 d
VA 1.2 h
2.00 d
VA 1.5 h
2.75 d
VA 2.0 h
0.75 d
VA 1.3 h
0.50 d
VA 56.3 min
0.50 d
Total Lead Time
8.92 d
VA Time
6.9 h
PCE
10.34%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step