Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Corporate Expat Work Permit & Relocation Desk
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.64 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.56%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Consulate Biometric Appointment
6 < 12/day
Limit: changeovers
Consulate Biometric Appointment: capacity 6/day vs demand 12/day. Main limit: changeovers. Raw C/T 40.1 min, effective C/T 53.0 min.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€68,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Embassy Consulates & …
Diplomas, Police Check …
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
Global Mobility HR
Sequential Silo Hand-offs
CUSTOMER
Relocated Senior Spec…
12 files/d
Takt: 37.5 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
19
1.58 d
Drag to reorder step 1
TALENT SOURCING
1. Role Quota Labor…
×2
Push Flow
C/T
24.0 min
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
3 / 1d
OEE
80.5%
i
Insert a step here
+
I
24
2.00 d
Drag to reorder step 2
HIRING PANEL
2. Apostille & Cons…
×3
Push Flow
C/T
30.0 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
3 / 1d
OEE
76.2%
i
Insert a step here
+
I
34
2.83 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Consulate Biomet…
×2
BOTTLENECK
C/T
40.1 min
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
2 / 1d
OEE
50.5%
i
Insert a step here
+
I
10
0.83 d
Drag to reorder step 4
PEOPLE OPS
4. Tax ID & Temp Ho…
×2
FIFO Lane
C/T
25.5 min
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
93.6%
i
FIFO
Insert a step here
+
I
6
0.50 d
Drag to reorder step 5
WORKPLACE
5. Airport Pickup &…
×2
Continuous Flow
C/T
18.8 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
97.5%
i
Insert a step at the end
+
I
7
0.58 d
Finished Goods
OUT
1.58 d
VA 24.0 min
2.00 d
VA 30.0 min
2.83 d
VA 40.1 min
0.83 d
VA 25.5 min
0.50 d
VA 18.8 min
0.58 d
Total Lead Time
8.64 d
VA Time
2.3 h
PCE
3.56%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step