Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Secure Employee Offboarding & Asset Recovery
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.49 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.98%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pre-Paid Return Laptop Box
11 < 22/day
Limit: changeovers
Pre-Paid Return Laptop Box: capacity 11/day vs demand 22/day. Main limit: changeovers. Raw C/T 21.9 min, effective C/T 28.9 min.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€21,045
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Departing Staff & IT …
Laptops, Badges & Payro…
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
ITSM HR Service Desk
Sequential Silo Hand-offs
CUSTOMER
InfoSec & HR Complian…
22 files/d
Takt: 20.5 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
35
1.59 d
Drag to reorder step 1
TALENT SOURCING
1. Resignation / Te…
×2
Push Flow
C/T
13.1 min
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
6 / 1d
OEE
81.1%
i
Insert a step here
+
I
44
2.00 d
Drag to reorder step 2
HIRING PANEL
2. SSO & VPN Instan…
×3
Push Flow
C/T
16.4 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
6 / 1d
OEE
77.1%
i
Insert a step here
+
I
62
2.82 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Pre-Paid Return …
×2
BOTTLENECK
C/T
21.9 min
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
4 / 1d
OEE
52.6%
i
Insert a step here
+
I
18
0.82 d
Drag to reorder step 4
PEOPLE OPS
4. Final Leave Payo…
×2
FIFO Lane
C/T
13.9 min
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
83.1%
i
FIFO
Insert a step here
+
I
11
0.50 d
Drag to reorder step 5
WORKPLACE
5. Exit Survey & Ar…
×2
Continuous Flow
C/T
10.2 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
90.9%
i
Insert a step at the end
+
I
13
0.59 d
Finished Goods
OUT
1.59 d
VA 13.1 min
2.00 d
VA 16.4 min
2.82 d
VA 21.9 min
0.82 d
VA 13.9 min
0.50 d
VA 10.2 min
0.59 d
Total Lead Time
8.49 d
VA Time
1.3 h
PCE
1.98%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step