Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
5.0 min
Lead Time (LT)
8.34 d
Value-Added
18.5 min
Efficiency (PCE)
0.49%
BottleneckFloor Practical Drive Eval
46 < 90/day
Limit: changeovers
Quality (RTY)
74.0%
WIP Capital
€48,555
Carbon CO₂
10.1 t CO₂e/year