Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Plant Operator Forklift & LOTO Annual Recert
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.34 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.49%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Floor Practical Drive Eval
46 < 90/day
Limit: changeovers
Floor Practical Drive Eval: capacity 46/day vs demand 90/day. Main limit: changeovers. Raw C/T 5.4 min, effective C/T 7.1 min.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€48,555
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Accredited Safety Tra…
Shopfloor Operator Rost…
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
Learning Management System
Sequential Silo Hand-offs
CUSTOMER
Plant HSE Directors
90 files/d
Takt: 5.0 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
144
1.60 d
Drag to reorder step 1
TALENT SOURCING
1. 60-Day Expiry Al…
×2
Push Flow
C/T
3.2 min
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
23 / 1d
OEE
80.6%
i
Insert a step here
+
I
180
2.00 d
Drag to reorder step 2
HIRING PANEL
2. E-Learning Theor…
×3
Push Flow
C/T
4.0 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
23 / 1d
OEE
76.4%
i
Insert a step here
+
I
252
2.80 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Floor Practical …
×2
BOTTLENECK
C/T
5.4 min
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
18 / 1d
OEE
54.7%
i
Insert a step here
+
I
72
0.80 d
Drag to reorder step 4
PEOPLE OPS
4. HSE Instructor S…
×2
FIFO Lane
C/T
3.4 min
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
9 / 1d
OEE
84.2%
i
FIFO
Insert a step here
+
I
45
0.50 d
Drag to reorder step 5
WORKPLACE
5. Badge RFID Machi…
×2
Continuous Flow
C/T
2.5 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
9 / 1d
OEE
91.6%
i
Insert a step at the end
+
I
54
0.60 d
Finished Goods
OUT
1.60 d
VA 3.2 min
2.00 d
VA 4.0 min
2.80 d
VA 5.4 min
0.80 d
VA 3.4 min
0.50 d
VA 2.5 min
0.60 d
Total Lead Time
8.34 d
VA Time
18.5 min
PCE
0.49%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step