Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
24/7 Factory 3-Shift Dynamic Workforce Rostering
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.32 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.25%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Fairness & Rest-Time Rules
92 < 180/day
Limit: changeovers
Fairness & Rest-Time Rules: capacity 92/day vs demand 180/day. Main limit: changeovers. Raw C/T 2.7 min, effective C/T 3.5 min.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€35,856
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
20.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Plant Time & Leave Re…
Machine Skill Certifica…
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
Workforce Scheduling Suite
Sequential Silo Hand-offs
CUSTOMER
Production Supervisors
180 files/d
Takt: 2.5 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
288
1.60 d
Drag to reorder step 1
TALENT SOURCING
1. Forecast Demand …
×2
Push Flow
C/T
96 s
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
45 / 1d
OEE
80.5%
i
Insert a step here
+
I
360
2.00 d
Drag to reorder step 2
HIRING PANEL
2. Skill-Matrix Mat…
×3
Push Flow
C/T
2.0 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
45 / 1d
OEE
76.2%
i
Insert a step here
+
I
504
2.80 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Fairness & Rest-…
×2
BOTTLENECK
C/T
2.7 min
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
36 / 1d
OEE
54.7%
i
Insert a step here
+
I
144
0.80 d
Drag to reorder step 4
PEOPLE OPS
4. Swap Exception D…
×2
FIFO Lane
C/T
102 s
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
18 / 1d
OEE
84.2%
i
FIFO
Insert a step here
+
I
90
0.50 d
Drag to reorder step 5
WORKPLACE
5. Mobile App Shift…
×2
Continuous Flow
C/T
75 s
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
18 / 1d
OEE
91.6%
i
Insert a step at the end
+
I
108
0.60 d
Finished Goods
OUT
1.60 d
VA 96 s
2.00 d
VA 2.0 min
2.80 d
VA 2.7 min
0.80 d
VA 102 s
0.50 d
VA 75 s
0.60 d
Total Lead Time
8.32 d
VA Time
9.2 min
PCE
0.25%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step