Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
ISO 37002 Ethics & Whistleblower Case Triage
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.71 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.29%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Forensic Interviews & Logs
4 < 8/day
Limit: changeovers
Forensic Interviews & Logs: capacity 4/day vs demand 8/day. Main limit: changeovers. Raw C/T 1.0 h, effective C/T 1.3 h.
Quality (RTY)
74.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€58,740
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Anonymous Web Hotline
Encrypted Ethics Reports
Weekly Screening · LT 4d
PRODUCTION CONTROL / ERP
Integrity Platform
Sequential Silo Hand-offs
CUSTOMER
Audit Committee Chair
8 cases/d
Takt: 56.3 min
EDI / Monday Cohort
MRP / Weekly Screening
★ PACEMAKER
IN
Insert a step at the start
+
I
13
1.63 d
Drag to reorder step 1
TALENT SOURCING
1. 24h Encrypted In…
×2
Push Flow
C/T
36.0 min
C/O
10 min
Availability
96%
Quality FPY
92.0%
Batch / EPEI
2 / 1d
OEE
80.5%
i
Insert a step here
+
I
16
2.00 d
Drag to reorder step 2
HIRING PANEL
2. Conflict-Free Tr…
×3
Push Flow
C/T
45.0 min
C/O
15 min
Availability
93%
Quality FPY
94.5%
Batch / EPEI
2 / 1d
OEE
76.2%
i
Insert a step here
+
I
22
2.75 d
KANBAN
Parallel …
Drag to reorder step 3
IT + LEGAL
3. Forensic Intervi…
×2
BOTTLENECK
C/T
1.0 h
C/O
25 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
2 / 1d
OEE
58.9%
i
Insert a step here
+
I
6
0.75 d
Drag to reorder step 4
PEOPLE OPS
4. Root-Cause Remed…
×2
FIFO Lane
C/T
38.3 min
C/O
5 min
Availability
97%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
93.6%
i
FIFO
Insert a step here
+
I
4
0.50 d
Drag to reorder step 5
WORKPLACE
5. Whistleblower Cl…
×2
Continuous Flow
C/T
28.1 min
C/O
3 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
97.5%
i
Insert a step at the end
+
I
5
0.63 d
Finished Goods
OUT
1.63 d
VA 36.0 min
2.00 d
VA 45.0 min
2.75 d
VA 1.0 h
0.75 d
VA 38.3 min
0.50 d
VA 28.1 min
0.63 d
Total Lead Time
8.71 d
VA Time
3.5 h
PCE
5.29%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step