Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Lithium Battery UN38.3 Air Transport Certification
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
6.39%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Crush & Overcharge Abuse T6–T7
4 < 6/day
Limit: downtime
Crush & Overcharge Abuse T6–T7: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 1.4 h, effective C/T 1.8 h.
Quality (RTY)
78.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€168,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Prototype Battery Pac…
16 Pack UN Test Samples
Quick-Turn Express · LT 5d
PRODUCTION CONTROL / ERP
Battery Lab ERP
Chamber Booking Bottleneck
CUSTOMER
Global Logistics & Cu…
6 cases/d
Takt: 1.3 h
EDI / EVT/DVT/PVT Gate
MRP / Quick-Turn Express
★ PACEMAKER
IN
Insert a step at the start
+
I
12
2.00 d
Drag to reorder step 1
PROTO SHOP
1. Altitude & Therm…
×3
Push Flow
C/T
54.0 min
C/O
20 min
Availability
94%
Quality FPY
96.5%
Batch / EPEI
5 / 2d
OEE
85.9%
i
Insert a step here
+
I
11
1.83 d
Drag to reorder step 2
BRING-UP LAB
2. Vibration, Shock…
×3
Push Flow
C/T
1.1 h
C/O
15 min
Availability
91%
Quality FPY
93.8%
Batch / EPEI
3 / 1d
OEE
79.7%
i
Insert a step here
+
I
18
3.00 d
QUALITY
Pre-Compl…
Drag to reorder step 3
CERT LAB
3. Crush & Overchar…
×2
BOTTLENECK
C/T
1.4 h
C/O
35 min
Availability
83%
Quality FPY
89.5%
Batch / EPEI
5 / 2d
OEE
67.4%
i
Insert a step here
+
I
7
1.17 d
Drag to reorder step 4
NPI TEAM
4. Drop 1.2m Packag…
×3
FIFO Lane
C/T
57.0 min
C/O
12 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
84.4%
i
FIFO
Insert a step here
+
I
4
0.67 d
Drag to reorder step 5
NPI GATE
5. UN38.3 Test Summ…
×2
FIFO Lane
C/T
42.0 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
96.0%
i
Insert a step at the end
+
I
6
1.00 d
Finished Goods
OUT
2.00 d
VA 54.0 min
1.83 d
VA 1.1 h
3.00 d
VA 1.4 h
1.17 d
VA 57.0 min
0.67 d
VA 42.0 min
1.00 d
Total Lead Time
10.3 d
VA Time
5.0 h
PCE
6.39%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step