Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Medical Device ISTA-3A Transit & Aging Study
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.30%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Dye Penetration Sterile Leak
7 < 12/day
Limit: downtime
Dye Penetration Sterile Leak: capacity 7/day vs demand 12/day. Main limit: downtime. Raw C/T 40.5 min, effective C/T 54.5 min.
Quality (RTY)
78.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€113,680
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Packaged Sterile Samp…
Environmental Aging Cha…
Quick-Turn Express · LT 5d
PRODUCTION CONTROL / ERP
Medical NPI ERP
Chamber Booking Bottleneck
CUSTOMER
FDA / MDR Submissions
12 cases/d
Takt: 37.5 min
EDI / EVT/DVT/PVT Gate
MRP / Quick-Turn Express
★ PACEMAKER
IN
Insert a step at the start
+
I
24
2.00 d
Drag to reorder step 1
PROTO SHOP
1. ASTM F1980 55°C …
×3
Push Flow
C/T
27.0 min
C/O
20 min
Availability
94%
Quality FPY
96.5%
Batch / EPEI
10 / 2d
OEE
85.9%
i
Insert a step here
+
I
22
1.83 d
Drag to reorder step 2
BRING-UP LAB
2. ISTA-3A Drop & R…
×3
Push Flow
C/T
31.5 min
C/O
15 min
Availability
91%
Quality FPY
93.8%
Batch / EPEI
6 / 1d
OEE
79.7%
i
Insert a step here
+
I
36
3.00 d
QUALITY
Pre-Compl…
Drag to reorder step 3
CERT LAB
3. Dye Penetration …
×2
BOTTLENECK
C/T
40.5 min
C/O
35 min
Availability
83%
Quality FPY
89.5%
Batch / EPEI
10 / 2d
OEE
67.4%
i
Insert a step here
+
I
14
1.17 d
Drag to reorder step 4
NPI TEAM
4. Peel Force Tensi…
×3
FIFO Lane
C/T
28.5 min
C/O
12 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
5 / 1d
OEE
85.9%
i
FIFO
Insert a step here
+
I
8
0.67 d
Drag to reorder step 5
NPI GATE
5. Design History F…
×2
FIFO Lane
C/T
21.0 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
90.6%
i
Insert a step at the end
+
I
12
1.00 d
Finished Goods
OUT
2.00 d
VA 27.0 min
1.83 d
VA 31.5 min
3.00 d
VA 40.5 min
1.17 d
VA 28.5 min
0.67 d
VA 21.0 min
1.00 d
Total Lead Time
10.00 d
VA Time
2.5 h
PCE
3.30%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step