EVT-to-DVT Injection Tooling Steel Release Gate
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.92%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Costed BOM & Tool Lead Review
6 < 10/day
Limit: downtime
Costed BOM & Tool Lead Review: capacity 6/day vs demand 10/day. Main limit: downtime. Raw C/T 48.6 min, effective C/T 1.1 h.
Quality (RTY)
78.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€140,650
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
China/EU Toolmakers
3D Plastics & Flow Sim
Quick-Turn Express · LT 5d
PRODUCTION CONTROL / ERP
PLM Platform
Chamber Booking Bottleneck
CUSTOMER
Hardware Ops & Supply…
10 cases/d
Takt: 45.0 min
EDI / EVT/DVT/PVT Gate
MRP / Quick-Turn Express
★ PACEMAKER
IN
Insert a step at the start
+
I
20
2.00 d
Drag to reorder step 1
PROTO SHOP
1. Flow Gate & Warp…
×3
Push Flow
C/T
32.4 min
C/O
20 min
Availability
94%
Quality FPY
96.5%
Batch / EPEI
8 / 2d
OEE
85.7%
i
Insert a step here
+
I
18
1.80 d
Drag to reorder step 2
BRING-UP LAB
2. Draft Angle & Un…
×3
Push Flow
C/T
37.8 min
C/O
15 min
Availability
91%
Quality FPY
93.8%
Batch / EPEI
5 / 1d
OEE
79.7%
i
Insert a step here
+
I
30
3.00 d
QUALITY
Pre-Compl…
Drag to reorder step 3
CERT LAB
3. Costed BOM & Too…
×2
BOTTLENECK
C/T
48.6 min
C/O
35 min
Availability
83%
Quality FPY
89.5%
Batch / EPEI
8 / 2d
OEE
67.1%
i
Insert a step here
+
I
12
1.20 d
Drag to reorder step 4
NPI TEAM
4. Tolerance Stack-…
×3
FIFO Lane
C/T
34.2 min
C/O
12 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
85.6%
i
FIFO
Insert a step here
+
I
7
0.70 d
Drag to reorder step 5
NPI GATE
5. Hard Steel P20 T…
×2
FIFO Lane
C/T
25.2 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
91.7%
i
Insert a step at the end
+
I
10
1.00 d
Finished Goods
OUT
2.00 d
VA 32.4 min
1.80 d
VA 37.8 min
3.00 d
VA 48.6 min
1.20 d
VA 34.2 min
0.70 d
VA 25.2 min
1.00 d
Total Lead Time
10.1 d
VA Time
3.0 h
PCE
3.92%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step