Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
56.3 min
Lead Time (LT)
10.2 d
Value-Added
3.7 h
Efficiency (PCE)
4.83%
Bottleneck6-Axis Robot E-Field Probe
5 < 8/day
Limit: downtime
Quality (RTY)
78.4%
WIP Capital
€163,800
Carbon CO₂
5.3 t CO₂e/year