Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hardware-in-Loop (HIL) Embedded Firmware Rig
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.83 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.34%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
CAN/LIN Bus Timing Capture
20 < 30/day
Limit: downtime
CAN/LIN Bus Timing Capture: capacity 20/day vs demand 30/day. Main limit: downtime. Raw C/T 32.4 min, effective C/T 43.6 min.
Quality (RTY)
78.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€48,015
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
19.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
HIL Test Rig Crates
ECU Hardware & Model-Ba…
Quick-Turn Express · LT 5d
PRODUCTION CONTROL / ERP
Jenkins + Test Rig
Chamber Booking Bottleneck
CUSTOMER
Firmware Control Teams
30 batches/d
Takt: 30.0 min
EDI / EVT/DVT/PVT Gate
MRP / Quick-Turn Express
★ PACEMAKER
IN
Insert a step at the start
+
I
60
2.00 d
Drag to reorder step 1
PROTO SHOP
1. Automated Binary…
×3
Push Flow
C/T
21.6 min
C/O
20 min
Availability
94%
Quality FPY
96.5%
Batch / EPEI
24 / 2d
OEE
88.2%
i
Insert a step here
+
I
54
1.80 d
Drag to reorder step 2
BRING-UP LAB
2. Simulated Sensor…
×3
Push Flow
C/T
25.2 min
C/O
15 min
Availability
91%
Quality FPY
93.8%
Batch / EPEI
15 / 1d
OEE
82.5%
i
Insert a step here
+
I
90
3.00 d
QUALITY
Pre-Compl…
Drag to reorder step 3
CERT LAB
3. CAN/LIN Bus Timi…
×2
BOTTLENECK
C/T
32.4 min
C/O
35 min
Availability
83%
Quality FPY
89.5%
Batch / EPEI
24 / 2d
OEE
70.7%
i
Insert a step here
+
I
36
1.20 d
Drag to reorder step 4
NPI TEAM
4. Coverage & Anoma…
×3
FIFO Lane
C/T
22.8 min
C/O
12 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
12 / 1d
OEE
88.7%
i
FIFO
Insert a step here
+
I
21
0.70 d
Drag to reorder step 5
NPI GATE
5. Signed Release C…
×2
FIFO Lane
C/T
16.8 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
6 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
30
1.00 d
Finished Goods
OUT
2.00 d
VA 21.6 min
1.80 d
VA 25.2 min
3.00 d
VA 32.4 min
1.20 d
VA 22.8 min
0.70 d
VA 16.8 min
1.00 d
Total Lead Time
9.83 d
VA Time
2.0 h
PCE
1.34%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step