Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Custom AR/VR Pancake Lens Optical Alignment
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.94 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.21%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Ghosting & Stray Light Check
11 < 18/day
Limit: downtime
Ghosting & Stray Light Check: capacity 11/day vs demand 18/day. Main limit: downtime. Raw C/T 27.0 min, effective C/T 36.3 min.
Quality (RTY)
78.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€155,750
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Optical Alignment Sys…
Micro-OLED & Pancake Op…
Quick-Turn Express · LT 5d
PRODUCTION CONTROL / ERP
Optics Lab ERP
Chamber Booking Bottleneck
CUSTOMER
XR Headset R&D Labs
18 cases/d
Takt: 25.0 min
EDI / EVT/DVT/PVT Gate
MRP / Quick-Turn Express
★ PACEMAKER
IN
Insert a step at the start
+
I
36
2.00 d
Drag to reorder step 1
PROTO SHOP
1. Clean Mount Micr…
×3
Push Flow
C/T
18.0 min
C/O
20 min
Availability
94%
Quality FPY
96.5%
Batch / EPEI
14 / 2d
OEE
85.5%
i
Insert a step here
+
I
32
1.78 d
Drag to reorder step 2
BRING-UP LAB
2. 6-Axis Tilt & Fo…
×3
Push Flow
C/T
21.0 min
C/O
15 min
Availability
91%
Quality FPY
93.8%
Batch / EPEI
9 / 1d
OEE
79.7%
i
Insert a step here
+
I
54
3.00 d
QUALITY
Pre-Compl…
Drag to reorder step 3
CERT LAB
3. Ghosting & Stray…
×2
BOTTLENECK
C/T
27.0 min
C/O
35 min
Availability
83%
Quality FPY
89.5%
Batch / EPEI
14 / 2d
OEE
66.9%
i
Insert a step here
+
I
22
1.22 d
Drag to reorder step 4
NPI TEAM
4. Binocular Vergen…
×3
FIFO Lane
C/T
19.0 min
C/O
12 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
7 / 1d
OEE
85.5%
i
FIFO
Insert a step here
+
I
13
0.72 d
Drag to reorder step 5
NPI GATE
5. Master Jig Toler…
×2
FIFO Lane
C/T
14.0 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
92.3%
i
Insert a step at the end
+
I
18
1.00 d
Finished Goods
OUT
2.00 d
VA 18.0 min
1.78 d
VA 21.0 min
3.00 d
VA 27.0 min
1.22 d
VA 19.0 min
0.72 d
VA 14.0 min
1.00 d
Total Lead Time
9.94 d
VA Time
1.7 h
PCE
2.21%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step