Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Thermal Dissipation Vapor-Chamber Wind Tunnel
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.94 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.49%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
IR Radiometric Map Capture
10 < 16/day
Limit: downtime
IR Radiometric Map Capture: capacity 10/day vs demand 16/day. Main limit: downtime. Raw C/T 30.4 min, effective C/T 40.9 min.
Quality (RTY)
78.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€65,100
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Macro IR & Airflow Rig
Bare Die Heaters & Heat…
Quick-Turn Express · LT 5d
PRODUCTION CONTROL / ERP
Thermal Lab ERP
Chamber Booking Bottleneck
CUSTOMER
Server & Laptop R&D
16 cases/d
Takt: 28.1 min
EDI / EVT/DVT/PVT Gate
MRP / Quick-Turn Express
★ PACEMAKER
IN
Insert a step at the start
+
I
32
2.00 d
Drag to reorder step 1
PROTO SHOP
1. Thermocouple Mat…
×3
Push Flow
C/T
20.3 min
C/O
20 min
Availability
94%
Quality FPY
96.5%
Batch / EPEI
13 / 2d
OEE
85.7%
i
Insert a step here
+
I
29
1.81 d
Drag to reorder step 2
BRING-UP LAB
2. Closed-Loop Airf…
×3
Push Flow
C/T
23.6 min
C/O
15 min
Availability
91%
Quality FPY
93.8%
Batch / EPEI
8 / 1d
OEE
79.7%
i
Insert a step here
+
I
48
3.00 d
QUALITY
Pre-Compl…
Drag to reorder step 3
CERT LAB
3. IR Radiometric M…
×2
BOTTLENECK
C/T
30.4 min
C/O
35 min
Availability
83%
Quality FPY
89.5%
Batch / EPEI
13 / 2d
OEE
67.2%
i
Insert a step here
+
I
19
1.19 d
Drag to reorder step 4
NPI TEAM
4. TIM Paste Thickn…
×3
FIFO Lane
C/T
21.4 min
C/O
12 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
6 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
11
0.69 d
Drag to reorder step 5
NPI GATE
5. Throttle Margin …
×2
FIFO Lane
C/T
15.8 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
3 / 1d
OEE
91.4%
i
Insert a step at the end
+
I
16
1.00 d
Finished Goods
OUT
2.00 d
VA 20.3 min
1.81 d
VA 23.6 min
3.00 d
VA 30.4 min
1.19 d
VA 21.4 min
0.69 d
VA 15.8 min
1.00 d
Total Lead Time
9.94 d
VA Time
1.9 h
PCE
2.49%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step