Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
28.1 min
Lead Time (LT)
9.94 d
Value-Added
1.9 h
Efficiency (PCE)
2.49%
BottleneckIR Radiometric Map Capture
10 < 16/day
Limit: downtime
Quality (RTY)
78.4%
WIP Capital
€65,100
Carbon CO₂
10.5 t CO₂e/year