Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
5.0 min
Lead Time (LT)
5.94 d
Value-Added
18.1 min
Efficiency (PCE)
0.68%
BottleneckWeekly CAB Risk Arbitration
60 < 90/day
Limit: downtime
Quality (RTY)
72.8%
WIP Capital
€45,135
Carbon CO₂
2.4 t CO₂e/year