Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Quarterly Multi-Region Disaster Recovery Drill
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.22 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.84%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Data Sync Lag & Auth Troubleshoot
8 < 12/day
Limit: downtime
Data Sync Lag & Auth Troubleshoot: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 40.1 min, effective C/T 51.9 min.
Quality (RTY)
72.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€102,950
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Primary Production Da…
DNS, Storage & App Clus…
Real-Time Alerts · LT 1d
PRODUCTION CONTROL / ERP
DR Orchestrator
Multi-Tier Escalation Ping-Pong
CUSTOMER
Bank Regulators & Con…
12 cases/d
Takt: 37.5 min
EDI / Continuous SLA
MRP / Real-Time Alerts
★ PACEMAKER
IN
Insert a step at the start
+
I
7
0.58 d
Drag to reorder step 1
L0 PORTAL
1. Pre-Drill Snapsh…
×2
FIFO Lane
C/T
20.3 min
C/O
2 min
Availability
98%
Quality FPY
91.5%
Batch / EPEI
1 / 1d
OEE
89.3%
i
FIFO
Insert a step here
+
I
17
1.42 d
Drag to reorder step 2
SERVICE DESK
2. Automated Runboo…
×6
Push Flow
C/T
30.0 min
C/O
4 min
Availability
94%
Quality FPY
93.0%
Batch / EPEI
2 / 1d
OEE
82.8%
i
Insert a step here
+
I
26
2.17 d
QUALITY
Shift-Lef…
Drag to reorder step 3
SYSOPS N2
3. Data Sync Lag & …
×4
BOTTLENECK
C/T
40.1 min
C/O
10 min
Availability
86%
Quality FPY
90.0%
Batch / EPEI
4 / 1d
OEE
72.2%
i
Insert a step here
+
I
11
0.92 d
Drag to reorder step 4
CHANGE MGMT
4. Business App Smo…
×2
FIFO Lane
C/T
27.0 min
C/O
6 min
Availability
95%
Quality FPY
96.5%
Batch / EPEI
2 / 1d
OEE
84.3%
i
FIFO
Insert a step here
+
I
5
0.42 d
Drag to reorder step 5
SERVICE QA
5. Failback & Regul…
×1
Continuous Flow
C/T
18.0 min
C/O
2 min
Availability
99%
Quality FPY
98.5%
Batch / EPEI
1 / 1d
OEE
97.1%
i
Insert a step at the end
+
I
5
0.42 d
Finished Goods
OUT
0.58 d
VA 20.3 min
1.42 d
VA 30.0 min
2.17 d
VA 40.1 min
0.92 d
VA 27.0 min
0.42 d
VA 18.0 min
0.42 d
Total Lead Time
6.22 d
VA Time
2.3 h
PCE
4.84%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step