Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Data Center Legacy Server Decommission & Wipe
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
16.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.02 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
58.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.14%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cables Unpatch & Rail Pull
19 < 28/day
Limit: downtime
Cables Unpatch & Rail Pull: capacity 19/day vs demand 28/day. Main limit: downtime. Raw C/T 17.2 min, effective C/T 22.2 min.
Quality (RTY)
72.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€39,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
CMDB Aging Server List
EOL Physical Rack Serve…
Real-Time Alerts · LT 1d
PRODUCTION CONTROL / ERP
DCIM + ITAD
Multi-Tier Escalation Ping-Pong
CUSTOMER
Facility Power Budget
28 units/d
Takt: 16.1 min
EDI / Continuous SLA
MRP / Real-Time Alerts
★ PACEMAKER
IN
Insert a step at the start
+
I
17
0.61 d
Drag to reorder step 1
L0 PORTAL
1. App Owner Migrat…
×2
FIFO Lane
C/T
8.7 min
C/O
2 min
Availability
98%
Quality FPY
91.5%
Batch / EPEI
3 / 1d
OEE
86.0%
i
FIFO
Insert a step here
+
I
39
1.39 d
Drag to reorder step 2
SERVICE DESK
2. Soft Shutdown & …
×6
Push Flow
C/T
12.9 min
C/O
4 min
Availability
94%
Quality FPY
93.0%
Batch / EPEI
6 / 1d
OEE
83.8%
i
Insert a step here
+
I
62
2.21 d
QUALITY
Shift-Lef…
Drag to reorder step 3
SYSOPS N2
3. Cables Unpatch &…
×4
BOTTLENECK
C/T
17.2 min
C/O
10 min
Availability
86%
Quality FPY
90.0%
Batch / EPEI
8 / 1d
OEE
71.4%
i
Insert a step here
+
I
25
0.89 d
Drag to reorder step 4
CHANGE MGMT
4. NIST Crypto Disk…
×2
FIFO Lane
C/T
11.6 min
C/O
6 min
Availability
95%
Quality FPY
96.5%
Batch / EPEI
6 / 1d
OEE
86.0%
i
FIFO
Insert a step here
+
I
11
0.39 d
Drag to reorder step 5
SERVICE QA
5. CMDB Retire & Po…
×1
Continuous Flow
C/T
7.7 min
C/O
2 min
Availability
99%
Quality FPY
98.5%
Batch / EPEI
3 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
11
0.39 d
Finished Goods
OUT
0.61 d
VA 8.7 min
1.39 d
VA 12.9 min
2.21 d
VA 17.2 min
0.89 d
VA 11.6 min
0.39 d
VA 7.7 min
0.39 d
Total Lead Time
6.02 d
VA Time
58.0 min
PCE
2.14%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step