Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Shadow-IT & Unused SaaS License Purge
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.93 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.44%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Manager Exception Hold Queue
94 < 140/day
Limit: downtime
Manager Exception Hold Queue: capacity 94/day vs demand 140/day. Main limit: downtime. Raw C/T 3.4 min, effective C/T 4.4 min.
Quality (RTY)
72.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€39,648
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
IdP SSO & Corporate C…
90-Day Inactive Seats
Real-Time Alerts · LT 1d
PRODUCTION CONTROL / ERP
SaaS Management Tool
Multi-Tier Escalation Ping-Pong
CUSTOMER
IT Procurement & CFO
140 tickets/d
Takt: 3.2 min
EDI / Continuous SLA
MRP / Real-Time Alerts
★ PACEMAKER
IN
Insert a step at the start
+
I
84
0.60 d
Drag to reorder step 1
L0 PORTAL
1. SSO Login Inacti…
×2
FIFO Lane
C/T
104 s
C/O
2 min
Availability
98%
Quality FPY
91.5%
Batch / EPEI
14 / 1d
OEE
85.7%
i
FIFO
Insert a step here
+
I
196
1.40 d
Drag to reorder step 2
SERVICE DESK
2. Automated Slack …
×6
Push Flow
C/T
2.6 min
C/O
4 min
Availability
94%
Quality FPY
93.0%
Batch / EPEI
28 / 1d
OEE
83.5%
i
Insert a step here
+
I
308
2.20 d
QUALITY
Shift-Lef…
Drag to reorder step 3
SYSOPS N2
3. Manager Exceptio…
×4
BOTTLENECK
C/T
3.4 min
C/O
10 min
Availability
86%
Quality FPY
90.0%
Batch / EPEI
42 / 1d
OEE
71.7%
i
Insert a step here
+
I
126
0.90 d
Drag to reorder step 4
CHANGE MGMT
4. API Seat Downgra…
×2
FIFO Lane
C/T
2.3 min
C/O
6 min
Availability
95%
Quality FPY
96.5%
Batch / EPEI
28 / 1d
OEE
85.6%
i
FIFO
Insert a step here
+
I
56
0.40 d
Drag to reorder step 5
SERVICE QA
5. Renewal Pool Cre…
×1
Continuous Flow
C/T
93 s
C/O
2 min
Availability
99%
Quality FPY
98.5%
Batch / EPEI
14 / 1d
OEE
93.2%
i
Insert a step at the end
+
I
56
0.40 d
Finished Goods
OUT
0.60 d
VA 104 s
1.40 d
VA 2.6 min
2.20 d
VA 3.4 min
0.90 d
VA 2.3 min
0.40 d
VA 93 s
0.40 d
Total Lead Time
5.93 d
VA Time
11.6 min
PCE
0.44%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step