Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
16.4 min
Lead Time (LT)
5.97 d
Value-Added
59.1 min
Efficiency (PCE)
1.10%
BottleneckChannel Co-Interference Tune
38 < 55/day
Limit: downtime
Quality (RTY)
72.8%
WIP Capital
€35,750
Carbon CO₂
1.5 t CO₂e/year