Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
96-Well Streptavidin Pre-Coated ELISA Plate
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.4 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
BSA Blocking & Vacuum Dry
5,786 < 8,500/day
Limit: downtime
BSA Blocking & Vacuum Dry: capacity 5,786/day vs demand 8,500/day. Main limit: downtime. Raw C/T 6.8 s, effective C/T 8.5 s.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€384,540
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
574.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Virgin High-Bind Poly…
Optical Polystyrene Pla…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Reagent Master Lot Push
CUSTOMER
Pharma & Research Labs
8,500 units/d
Takt: 6.4 s
EDI / Daily Temp-Controlled
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
12,750
1.50 d
Drag to reorder step 1
DRY BIO BAY
1. Optically Clear …
×2
Push Flow
C/T
4.3 s
C/O
35 min
Availability
94%
Quality FPY
98.1%
Batch / EPEI
8500 / 2d
OEE
88.6%
i
Insert a step here
+
I
11,900
1.40 d
Drag to reorder step 2
DRY ROOM <20%
2. Automated 96-Cha…
×2
Push Flow
C/T
5.2 s
C/O
25 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
5100 / 1d
OEE
85.5%
i
Insert a step here
+
I
15,300
1.80 d
TPM
Rotary Co…
Drag to reorder step 3
HIGH-SPEED LINE
3. BSA Blocking & V…
×3
BOTTLENECK
C/T
6.8 s
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
4250 / 1d
OEE
72.9%
i
Insert a step here
+
I
8,500
1.00 d
Drag to reorder step 4
FOIL POUCH
4. Foil Bag Desicca…
×2
FIFO Lane
C/T
4.7 s
C/O
15 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
3400 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
10,200
1.20 d
Drag to reorder step 5
IVD QA/PACK
5. CV <4% Optical U…
×2
FIFO Lane
C/T
3.8 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
4250 / 1d
OEE
93.0%
i
Insert a step at the end
+
I
15,300
1.80 d
Finished Goods
OUT
1.50 d
VA 4.3 s
1.40 d
VA 5.2 s
1.80 d
VA 6.8 s
1.00 d
VA 4.7 s
1.20 d
VA 3.8 s
1.80 d
Total Lead Time
8.70 d
VA Time
25 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step