Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
0.5 s
Lead Time (LT)
8.70 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckEnzyme Slot-Die Coat & Dry
50,780 < 160,000/day
Limit: downtime
Quality (RTY)
88.9%
WIP Capital
€111,360
Carbon CO₂
10,813.4 t CO₂e/year