Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.9 s
Lead Time (LT)
8.70 d
Value-Added
7.6 s
Efficiency (PCE)
0.00%
Bottleneck5-Circle Die & Barcode Match
18,735 < 28,000/day
Limit: downtime
Quality (RTY)
88.9%
WIP Capital
€133,980
Carbon CO₂
1,892.4 t CO₂e/year