Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.2 s
Lead Time (LT)
8.70 d
Value-Added
6.1 s
Efficiency (PCE)
0.00%
BottleneckCeramic Thermal Tab Print
30,265 < 45,000/day
Limit: downtime
Quality (RTY)
88.9%
WIP Capital
€137,025
Carbon CO₂
3,041.3 t CO₂e/year