Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Chemiluminescence CLIA Automated Reagent Pack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
8.7 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
34 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Snap Cartridge Heat Welding
4,231 < 6,200/day
Limit: downtime
Snap Cartridge Heat Welding: capacity 4,231/day vs demand 6,200/day. Main limit: downtime. Raw C/T 9.3 s, effective C/T 12 s.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€970,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
419.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Magnetic Beads
Acridinium Conjugates &…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
MES
Reagent Master Lot Push
CUSTOMER
Hospital Core Analyze…
6,200 packs/d
Takt: 8.7 s
EDI / Daily Temp-Controlled
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
9,300
1.50 d
Drag to reorder step 1
DRY BIO BAY
1. Cold Bead Buffer…
×2
Push Flow
C/T
5.9 s
C/O
35 min
Availability
94%
Quality FPY
98.1%
Batch / EPEI
6200 / 2d
OEE
88.6%
i
Insert a step here
+
I
8,680
1.40 d
Drag to reorder step 2
DRY ROOM <20%
2. Dual-Nozzle Asep…
×2
Push Flow
C/T
7.1 s
C/O
25 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
3720 / 1d
OEE
85.5%
i
Insert a step here
+
I
11,160
1.80 d
TPM
Rotary Co…
Drag to reorder step 3
HIGH-SPEED LINE
3. Snap Cartridge H…
×3
BOTTLENECK
C/T
9.3 s
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
3100 / 1d
OEE
72.9%
i
Insert a step here
+
I
6,200
1.00 d
Drag to reorder step 4
FOIL POUCH
4. RFID Lot Calibra…
×2
FIFO Lane
C/T
6.4 s
C/O
15 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
2480 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
7,440
1.20 d
Drag to reorder step 5
IVD QA/PACK
5. Analyzer Blind P…
×2
FIFO Lane
C/T
5.2 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
3100 / 1d
OEE
93.0%
i
Insert a step at the end
+
I
11,160
1.80 d
Finished Goods
OUT
1.50 d
VA 5.9 s
1.40 d
VA 7.1 s
1.80 d
VA 9.3 s
1.00 d
VA 6.4 s
1.20 d
VA 5.2 s
1.80 d
Total Lead Time
8.70 d
VA Time
34 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step