Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.0 s
Lead Time (LT)
8.70 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckHigh-Speed Reel Strip Slit
50,780 < 85,000/day
Limit: downtime
Quality (RTY)
88.9%
WIP Capital
€332,775
Carbon CO₂
5,744.6 t CO₂e/year