Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
83 s
Lead Time (LT)
8.71 d
Value-Added
5.4 min
Efficiency (PCE)
0.07%
BottleneckOligo Surface Lawn Grafting
442 < 650/day
Limit: downtime
Quality (RTY)
88.9%
WIP Capital
€1,357,200
Carbon CO₂
43.9 t CO₂e/year