Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Flocked Nasopharyngeal Swab & Liquid Amies
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.2 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Tube Amies Media Fill & Cap
28,103 < 42,000/day
Limit: downtime
Tube Amies Media Fill & Cap: capacity 28,103/day vs demand 42,000/day. Main limit: downtime. Raw C/T 1.4 s, effective C/T 1.8 s.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€153,468
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,838.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Nylon Flock Fibers
PP Breakpoint Shafts & …
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Reagent Master Lot Push
CUSTOMER
Diagnostic Specimen S…
42,000 units/d
Takt: 1.3 s
EDI / Daily Temp-Controlled
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
63,000
1.50 d
Drag to reorder step 1
DRY BIO BAY
1. Injection Shaft …
×2
Push Flow
C/T
1.2 s
C/O
35 min
Availability
94%
Quality FPY
98.1%
Batch / EPEI
42000 / 2d
OEE
88.6%
i
Insert a step here
+
I
58,800
1.40 d
Drag to reorder step 2
DRY ROOM <20%
2. Electrostatic Fl…
×2
Push Flow
C/T
1.2 s
C/O
25 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
25200 / 1d
OEE
85.5%
i
Insert a step here
+
I
75,600
1.80 d
TPM
Rotary Co…
Drag to reorder step 3
HIGH-SPEED LINE
3. Tube Amies Media…
×3
BOTTLENECK
C/T
1.4 s
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
21000 / 1d
OEE
72.9%
i
Insert a step here
+
I
42,000
1.00 d
Drag to reorder step 4
FOIL POUCH
4. Dual Swab + Tube…
×2
FIFO Lane
C/T
1.2 s
C/O
15 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
16800 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
50,400
1.20 d
Drag to reorder step 5
IVD QA/PACK
5. Gamma Irradiatio…
×2
FIFO Lane
C/T
1.2 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
21000 / 1d
OEE
93.0%
i
Insert a step at the end
+
I
75,600
1.80 d
Finished Goods
OUT
1.50 d
VA 1.2 s
1.40 d
VA 1.2 s
1.80 d
VA 1.4 s
1.00 d
VA 1.2 s
1.20 d
VA 1.2 s
1.80 d
Total Lead Time
8.70 d
VA Time
6.2 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step