Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
7.5 min
Lead Time (LT)
4.42 d
Value-Added
27.6 min
Efficiency (PCE)
0.46%
BottleneckElectronic / Serology Cross
129 < 180/day
Limit: downtime
Quality (RTY)
89.5%
WIP Capital
€33,264
Carbon CO₂
9.6 t CO₂e/year