Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
6.4 min
Lead Time (LT)
4.43 d
Value-Added
23.7 min
Efficiency (PCE)
0.59%
Bottleneck5-Axis Wet/Dry Disc Mill
98 < 140/day
Limit: downtime
Quality (RTY)
89.5%
WIP Capital
€52,360
Carbon CO₂
7.5 t CO₂e/year