Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Clinical Whole-Exome DNA Sequencing (NGS) Lab
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.45 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
34.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.87%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Flow-Cell Clustering
67 < 95/day
Limit: downtime
Flow-Cell Clustering: capacity 67/day vs demand 95/day. Main limit: downtime. Raw C/T 10.1 min, effective C/T 12.7 min.
Quality (RTY)
89.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€142,460
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
High-Throughput Seque…
FFPE Tumor & Blood DNA
3x / week · LT 2d
PRODUCTION CONTROL / ERP
Genomic LIMS
Large Rack Batch Loading
CUSTOMER
Oncology Genomic Clin…
95 samples/d
Takt: 9.5 min
EDI / Continuous HL7
MRP / 3x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
67
0.71 d
Drag to reorder step 1
PRE-ANALYTICS
1. Automated DNA/RN…
×3
FIFO Lane
C/T
5.7 min
C/O
5 min
Availability
97%
Quality FPY
98.2%
Batch / EPEI
29 / 1d
OEE
93.5%
i
FIFO
Insert a step here
+
I
95
1.00 d
Drag to reorder step 2
PREP TRACK
2. Library Prep & H…
×2
Push Flow
C/T
7.4 min
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
29 / 1d
OEE
88.3%
i
Insert a step here
+
I
133
1.40 d
AUTOMATION
Single-Pi…
Drag to reorder step 3
ANALYTICS
3. Flow-Cell Cluste…
×3
BOTTLENECK
C/T
10.1 min
C/O
20 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
38 / 1d
OEE
74.6%
i
Insert a step here
+
I
57
0.60 d
Drag to reorder step 4
MEDICAL REVIEW
4. Cloud Bioinforma…
×2
FIFO Lane
C/T
7.2 min
C/O
3 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
19 / 1d
OEE
93.3%
i
FIFO
Insert a step here
+
I
29
0.31 d
Drag to reorder step 5
EHR PORTAL
5. Molecular Pathol…
×1
Continuous Flow
C/T
4.6 min
C/O
2 min
Availability
99%
Quality FPY
99.6%
Batch / EPEI
10 / 1d
OEE
96.5%
i
Insert a step at the end
+
I
38
0.40 d
Finished Goods
OUT
0.71 d
VA 5.7 min
1.00 d
VA 7.4 min
1.40 d
VA 10.1 min
0.60 d
VA 7.2 min
0.31 d
VA 4.6 min
0.40 d
Total Lead Time
4.45 d
VA Time
34.9 min
PCE
0.87%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step