Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Cancer Tissue Biopsy Histopathology & Stain Lab
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
64 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.41 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Microtome 4um Wax Ribbon Cut
279 < 420/day
Limit: downtime
Microtome 4um Wax Ribbon Cut: capacity 279/day vs demand 420/day. Main limit: downtime. Raw C/T 68 s, effective C/T 86 s.
Quality (RTY)
89.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€88,704
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
22.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
OR Surgical Biopsy Ca…
Paraffin Wax & IHC Anti…
3x / week · LT 2d
PRODUCTION CONTROL / ERP
Pathology LIS
Large Rack Batch Loading
CUSTOMER
Oncology Tumor Boards
420 samples/d
Takt: 64 s
EDI / Continuous HL7
MRP / 3x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
294
0.70 d
Drag to reorder step 1
PRE-ANALYTICS
1. Grossing Dissect…
×3
FIFO Lane
C/T
39 s
C/O
5 min
Availability
97%
Quality FPY
98.2%
Batch / EPEI
126 / 1d
OEE
91.7%
i
FIFO
Insert a step here
+
I
420
1.00 d
Drag to reorder step 2
PREP TRACK
2. Overnight Tissue…
×2
Push Flow
C/T
50 s
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
126 / 1d
OEE
84.8%
i
Insert a step here
+
I
588
1.40 d
AUTOMATION
Single-Pi…
Drag to reorder step 3
ANALYTICS
3. Microtome 4um Wa…
×3
BOTTLENECK
C/T
68 s
C/O
20 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
168 / 1d
OEE
70.2%
i
Insert a step here
+
I
252
0.60 d
Drag to reorder step 4
MEDICAL REVIEW
4. H&E / IHC Auto-S…
×2
FIFO Lane
C/T
49 s
C/O
3 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
84 / 1d
OEE
91.7%
i
FIFO
Insert a step here
+
I
126
0.30 d
Drag to reorder step 5
EHR PORTAL
5. Digital Whole-Sl…
×1
Continuous Flow
C/T
31 s
C/O
2 min
Availability
99%
Quality FPY
99.6%
Batch / EPEI
42 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
168
0.40 d
Finished Goods
OUT
0.70 d
VA 39 s
1.00 d
VA 50 s
1.40 d
VA 68 s
0.60 d
VA 49 s
0.30 d
VA 31 s
0.40 d
Total Lead Time
4.41 d
VA Time
3.9 min
PCE
0.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step