Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
F18-FDG Nuclear Medicine PET-CT Cancer Scan
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
17.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.53 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.13%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
20-Min Whole-Body PET-CT Scan
17 < 26/day
Limit: downtime
20-Min Whole-Body PET-CT Scan: capacity 17/day vs demand 26/day. Main limit: downtime. Raw C/T 18.4 min, effective C/T 23.2 min.
Quality (RTY)
89.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€77,520
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cyclotron Isotope Cou…
110-Min Half-Life F18-F…
3x / week · LT 2d
PRODUCTION CONTROL / ERP
Nuclear RIS
Large Rack Batch Loading
CUSTOMER
Oncology Staging Boar…
26 patients/d
Takt: 17.3 min
EDI / Continuous HL7
MRP / 3x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
18
0.69 d
Drag to reorder step 1
PRE-ANALYTICS
1. Glucose Check & …
×3
FIFO Lane
C/T
10.4 min
C/O
5 min
Availability
97%
Quality FPY
98.2%
Batch / EPEI
8 / 1d
OEE
91.8%
i
FIFO
Insert a step here
+
I
26
1.00 d
Drag to reorder step 2
PREP TRACK
2. 60-Min Quiet Upt…
×2
Push Flow
C/T
13.5 min
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
8 / 1d
OEE
85.0%
i
Insert a step here
+
I
36
1.38 d
AUTOMATION
Single-Pi…
Drag to reorder step 3
ANALYTICS
3. 20-Min Whole-Bod…
×3
BOTTLENECK
C/T
18.4 min
C/O
20 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
10 / 1d
OEE
69.8%
i
Insert a step here
+
I
16
0.62 d
Drag to reorder step 4
MEDICAL REVIEW
4. SUV Quant Recons…
×2
FIFO Lane
C/T
13.2 min
C/O
3 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
5 / 1d
OEE
91.6%
i
FIFO
Insert a step here
+
I
8
0.31 d
Drag to reorder step 5
EHR PORTAL
5. Nuclear Physicia…
×1
Continuous Flow
C/T
8.3 min
C/O
2 min
Availability
99%
Quality FPY
99.6%
Batch / EPEI
3 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
10
0.38 d
Finished Goods
OUT
0.69 d
VA 10.4 min
1.00 d
VA 13.5 min
1.38 d
VA 18.4 min
0.62 d
VA 13.2 min
0.31 d
VA 8.3 min
0.38 d
Total Lead Time
4.53 d
VA Time
1.1 h
PCE
3.13%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step