Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
In-Clinic & Home Polysomnography Sleep Study
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
14.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.52 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
51.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.54%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
AI Stage Auto-Scoring Review
21 < 32/day
Limit: downtime
AI Stage Auto-Scoring Review: capacity 21/day vs demand 32/day. Main limit: downtime. Raw C/T 14.9 min, effective C/T 18.9 min.
Quality (RTY)
89.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€43,710
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Sleep Monitoring Head…
EEG Electrodes & Airflo…
3x / week · LT 2d
PRODUCTION CONTROL / ERP
Sleep EHR
Large Rack Batch Loading
CUSTOMER
Sleep Medicine Clinics
32 patients/d
Takt: 14.1 min
EDI / Continuous HL7
MRP / 3x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
22
0.69 d
Drag to reorder step 1
PRE-ANALYTICS
1. Evening Hook-Up …
×3
FIFO Lane
C/T
8.4 min
C/O
5 min
Availability
97%
Quality FPY
98.2%
Batch / EPEI
10 / 1d
OEE
91.9%
i
FIFO
Insert a step here
+
I
32
1.00 d
Drag to reorder step 2
PREP TRACK
2. Overnight Sleep …
×2
Push Flow
C/T
11.0 min
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
10 / 1d
OEE
85.1%
i
Insert a step here
+
I
45
1.41 d
AUTOMATION
Single-Pi…
Drag to reorder step 3
ANALYTICS
3. AI Stage Auto-Sc…
×3
BOTTLENECK
C/T
14.9 min
C/O
20 min
Availability
84%
Quality FPY
94.0%
Batch / EPEI
13 / 1d
OEE
70.3%
i
Insert a step here
+
I
19
0.59 d
Drag to reorder step 4
MEDICAL REVIEW
4. Sleep Physician …
×2
FIFO Lane
C/T
10.7 min
C/O
3 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
6 / 1d
OEE
91.5%
i
FIFO
Insert a step here
+
I
10
0.31 d
Drag to reorder step 5
EHR PORTAL
5. Mask Fit & Cloud…
×1
Continuous Flow
C/T
6.8 min
C/O
2 min
Availability
99%
Quality FPY
99.6%
Batch / EPEI
3 / 1d
OEE
93.9%
i
Insert a step at the end
+
I
13
0.41 d
Finished Goods
OUT
0.69 d
VA 8.4 min
1.00 d
VA 11.0 min
1.41 d
VA 14.9 min
0.59 d
VA 10.7 min
0.31 d
VA 6.8 min
0.41 d
Total Lead Time
4.52 d
VA Time
51.7 min
PCE
2.54%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step