Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
7.5 min
Lead Time (LT)
3.83 d
Value-Added
28.7 min
Efficiency (PCE)
0.83%
BottleneckCross-Dock Line-Side Sort
82 < 120/day
Limit: downtime
Quality (RTY)
87.8%
WIP Capital
€66,120
Carbon CO₂
52.3 t CO₂e/year